Skip to content
Development decision intelligence

Decide whether to buy, option, redesign or walk — on evidence, traced to source.

Before you spend a lot on a site, spend a little to understand it properly. Site Intelligence turns planning policy, technical constraints and indicative viability into one source-traced decision pack for developers, landowners and investors.

Free instant check · no sign-up · pin or draw your boundary

Indicative aerial imagery of an example development site with the site boundary drawn in red

The schedule fills in as the site is read.

  1. Policy
    NPPF F4 · F5
    Evidence
    Flood Risk Assessment
    Brief
    Build clear of the flood zone
  2. Policy
    NPPF HE9
    Evidence
    Heritage Statement
    Brief
    North edge designed to suit its setting
  3. Policy
    NPPF N2
    Evidence
    Preliminary Ecological Appraisal, BNG Screening Statement
    Brief
    Tree belt kept, with a buffer

1 of 5 Every check starts from the site boundary: a registered parcel, a pinned point or a drawn plot.

Check your own site

The story of one site

Decided on paper first, so the work on site never waits on a question the desk could have answered.

  1. SurveySite Appraisal
  2. GroundworksFeasibility Intelligence
  3. RisingPre-Application Pack
  4. CompleteConsultant Handover Pack
Illustrative generated scene: one field seen from the same spot at each stage, from survey to four finished homes

Illustrative: a generated scene, not a real site or scheme.

  1. Stage 1 of 4

    Survey

    The boundary is pegged and the way in set out. This is where a site’s limits start to cost money, so they are best known before the land is bought.

    From the deskSite Appraisal

    The boundary, the way in and every mapped constraint, with a go or no-go verdict, before the land is bought.

    On the drawing

    • Site boundary
    • Access
  2. Stage 2 of 4

    Groundworks

    The road and foundations go where the ground and the constraints allow. Flood risk, drainage and protected trees all surface here, if they were not found first.

    From the deskFeasibility Intelligence

    Flood risk and protected trees mapped, and the high-level build costs tested, so the price paid for the land reflects them.

    On the drawing

    • Flood zone
    • Root protection area
    • Scheme footprints
  3. Stage 3 of 4

    Rising

    Walls and roofs go up on a scheme that has to work for planning, cost and value. Changing it now is expensive. Changing it on paper was not.

    From the deskPre-Application Pack

    The planning case, a draft planning statement and targeted questions for the council, ready before the scheme is fixed.

    On the drawing

    • Conservation area
    • Key view to the church tower
  4. Stage 4 of 4

    Complete

    Four homes, and the old oak on a green. The decisions that made it possible were taken before the first peg went in.

    From the deskConsultant Handover Pack

    One evidence base, organised for the architect, quantity surveyor, ecologist and highways engineer, so every consultant starts from the same page.

    Request a quote
The decision

Four ways a site decision goes.

These are the four moves a site decision comes down to, not our four products. Each of our products gives you the evidence to choose your next move.

The wrong site does not fail cheaply. Most reveal their expensive problems after the architects and specialists are instructed, so we bring the evidence forward while the scheme is still cheap to change.

Buy

Proceed knowing what the site triggers, what it costs, and what to instruct first.

Option

Secure the site while the planning route is tested and proven.

Redesign

Change the scheme while change is still cheap.

Walk away

Decline early, before the consultant budget is spent.

Site-specific, not a checklist

One site, read layer by layer

Choose a layer to see what it tells you about the land. These are the maps from a real demonstration pack for land at Chilham, Kent.

Site location in its settlement and highway context
1 of 6 · Locate

Maps rendered 10 July 2026 from Ordnance Survey, HM Land Registry, Environment Agency, Historic England and Natural England data, credited on each map.

Official figures, dated

Your council, in numbers

How the council has delivered housing, and how long it takes to decide applications, from the figures the free check and the council pages already carry.

274 councils with measured figures
Housing Delivery Test 2025
79% of its requirement

2,645 homes delivered against a requirement of 3,345 over the three years measured. It fell short of its housing requirement, so it must hold extra housing land in reserve.

MHCLG, published 17 August 2026.

Measured decision time
  • Major schemes41.7 weeks, median of 54
  • All other applications8 weeks, median of 140

Weeks from validation to decision, from the council’s own register, decided 1 July 2024 to 13 July 2026.

26 councils, including Bath and North East Somerset and Birmingham, also have a written local guide: planning in your area.

Find your product

Which product is right for you?

Tell us where you are in the decision. We match you to the product, priced by your scheme size.

We recommend

Site Appraisal

"Is this site worth looking at?"

A go / no-go read: a traffic-light constraint summary, a fatal-flaw check, and the list of reports you would need if you proceed.

From £295priced by scheme size
1–9 units £29510–50 units £39551–200 units £595200+ units from £895
Request a Site Appraisal quote

How it works

Three steps from site address to a source-traced desktop intelligence pack.

1

Tell us your site

Share the address, the development type, and the scale. That's all we need.

2

We detect constraints automatically

We cross-reference authoritative public datasets and run automated quality checks to map the constraints that apply and the specialist input your site is likely to need.

3

Receive your tailored report pack

Your desktop report pack arrives on the delivery date confirmed before you pay — every figure traced to source, every constraint mapped, and a clear steer on which specialists to instruct next.

See what lands on your desk: browse the sample reports, or every product and price.

Who stands behind the work

What every pack goes through before it is issued, and what is not included. No vague sign-offs.

Standard on every pack

System quality assurance

Automated checks run on every report before issue, testing data handling, internal consistency, formatting, citations, and potential accuracy and compliance issues.

Standard on every pack

Every figure traced to source

Every number in the pack carries its source and the date that source was collected, so you can check it yourself.

Standard on every pack

Checked by a person

A person checks every pack before it is issued. No report reaches a client on automation alone.

Not included

Chartered sign-off

Chartered sign-off is not included. Where a scheme needs a chartered professional's report or sign-off, the pack says so and names what to commission.

A person checks every pack before it is issued. That check is not chartered sign-off: where a scheme needs a chartered professional, the pack names what to commission, and your consultant finalises that work and signs it off.

PF & Co stands behind every brief it issues. If a figure is challenged, its source, date and reasoning are one click away.

Sources, with their dates

How old is the data behind a check?

The free check reads national datasets published through the government’s planning data platform. Each one is only as current as its last collection, so here is when each was last collected.

national datasets the free check reads, each dated below
31
national datasets the free check reads, each dated below
delivery date, before you pay
Confirmed
delivery date, before you pay
local planning authorities in England covered
308
local planning authorities in England covered
DatasetLast collectedAge
Article 4 directions27 Sep 202622 days
Conservation areas27 Sep 202622 days
Protected trees27 Sep 202622 days
Tree preservation order areas27 Sep 202622 days
Listed buildings26 Sep 202623 days
Registered parks and gardens26 Sep 202623 days
Scheduled monuments26 Sep 202623 days
Brownfield land registers25 Sep 202624 days
World Heritage Sites25 Sep 202624 days
Local plans19 Sep 202630 days
Local nature reserves20 Aug 20262 months
Sites of Special Scientific Interest20 Aug 20262 months
Assets of community value5 Aug 20262 months
National nature reserves22 Jul 20263 months
Green Belt10 May 20265 months
Nutrient neutrality catchments7 May 20265 months
Air quality management areas15 Apr 20266 months
Ancient woodland21 Mar 20267 months
National Landscapes (AONB)15 Feb 20268 months
National Parks31 Dec 202510 months
Locally listed buildings22 Nov 202511 months
Heritage at risk30 Sep 202513 months
Flood storage areas8 Aug 202514 months
Heritage Coasts2 May 202518 months
Special Protection Areas28 Feb 202520 months
Registered battlefields12 Feb 202520 months
Ramsar sites4 Oct 202424 months
Special Areas of Conservation18 Sep 202425 months
Agricultural land classification15 Jul 202427 months
Nationally significant infrastructure projects29 Sep 202337 months
Flood zonesFor a dropped pin the check reads the Environment Agency’s current flood map live; this date is the national platform’s copy.24 Aug 202338 months

A collection date is when the national platform last took in new data for that layer, not a promise that the underlying record is current. Dates as recorded on 27 September 2026, from planning.data.gov.uk (Open Government Licence v3.0).

Planning work on your own home?

Extension, loft, outbuilding or buying a plot — a plain-English planning review is coming later. Register interest and we will email you when it opens.

Register interest

Ready to see what your site needs?

Check any site in England free, or tell us what you are deciding and we will say which report fits. We confirm the scope, the price and the delivery date before you pay.